Basement Bathroom / Laundry Remodel Project
This task included entirely renovating a basement bathroom / laundry room in a house that is 111-year-old St. Paul, MN. This task posed many different issues typical in taking care of older houses. The walk-in that is existing shower was poorly damaged due to moisture and dampness dilemmas. The dryer was illegally vented by having a make shift accordion style plastic vent presenting a dangerous fire risk. The area had a non-functioning wall that is electric designed to heat up the room. a layout that is awkward utilizing the room hard.
Due to the chronilogical age of the household we recognized we might be served with an abundance of shocks once construction began. We decided it might make more feeling to demolish the space right down to the bare studs and foundation to show a better notion of our situation. The bare walls exposed outdated plumbing that is galvanized some cracks when you look at the foundation and a concealed screen that were covered.
The next phase into the project would be to have our plumber go some drains, ports and water lines to support the brand new room layout. Because of the brand new plumbing set up we had 12,000 pounds of brand new concrete poured to generate a floor foundation that is new. brand New 2?6 outside walls, 2?4 interior walls and 3’ x 3’shower had been framed to make the brand new space. Our electrician visited your website and installed the rough wiring that is electrical outlets, lighting, warming chords, fan and switches. The external walls had been sprayed with foam insulation to help keep the toilet warmer.
This can be a washer that is new laundry sink and dryer design
Because of the preparation work off the beaten track the walls had been sheet-rocked with lightweight drywall and also the bath ended up being covered with cement board coated with green waterproofing. One bath wall ended up being framed to add two recessed 12” x 12” ledges for soap and shampoo. We contacted an organization to install a glass that is frosted screen with a screened vent to the present window opening allowing outdoors in to the space on good days.
We selected and installed subway that is white with grey accents when you look at the bath along with 1” mosaic glass tile into the recessed ledges. The tile for this task was purchased at Kate-Lo Tile in Plymouth, MN. Self-leveling thin set concrete was poured on the heating chords on the ground before installing the 2” x 2” white marble tile through the entire space with white grout.
A fresh wooden door had been painted white and hung with satin nickel hardware. We painted the walls Venezuelan Blue and set up trim that is white the beds base and home. We purchased a 48” white traditional design vanity with black colored marble countertop and satin nickel faucets from Menards. The vanity ended up being situated in the part regarding the available space and a matching mirror had been mounted above. The Delta shower fixtures had been selected to suit the sink faucets. a washing sink ended up being set up across the wall in between your dryer and washer devices.
Next we installed the fallen ceiling that is acoustical and tiles. The roof system needed to be bent over a low pipeline in the biggest market of the space nevertheless the outcome ended up being hardly visible. The plumbing technicians and electricians returned for final hookups associated with washer, dryer, sinks, heated floors and recessed can lights.